Antique, Modern Window Restoration

110 Hudson St. Window Restoration Project

Tasks: Stripped window sashes and frames. Sanded sashes to prepare for clear finishes and paint. Repaired of sashes in the shop, and adjusted weights for correct balance of sashes.

Turn of Century Window damaged by Sash Pole Window Sash Pole Damage repaired with Dutchman inlay
Turn of Century Window damaged by Sash Pole
Window Sash Pole Damage repaired with Dutchman inlay
Window restoration before stripping before stripping, Sill checked, requires consolidation
Window before stripping
Window Sash Pole Damage repaired with Dutchman inlay
after Stripping and Refinishing Restoration Double Hung after Restoration
Window and Casing after Stripping and Refinishing Restoration
Double Hung Window after Restoration

Bikuben Foundation, Inc. Project operated by Olek & Lejbzon Co.

Removal of existing sash units for repair, installation of new glazing, shop finishing and hardware repair, refinishing and replacement of windows. On-site repair and sill replacement of existing window units.

Casement Window with Transom before Restoration, with damages from poles Winodws being restored-stripped, repaired
Casement Window with Transom before Restoration, with damages from poles
Winodws being restored-stripped, repaired
Casement Window with Dutchman Inlays, replacing rotten wood Casement Sash Window after Restoration and Painting
Casement Window with Dutchman Inlays, replacing rotten wood
Casement Sash Window after Repair and Painting

NYC Transit- MTA: White Plains Rd. Line Rehabilitation of Pelham Parkway [Elevated Subway] Station

Repair of sashes and frames, including Dutchman inlays and consolidation, sanding and preparation for finishing. Bench assembly of shop mock-ups for repairing projects of architectural woodwork.

Poor Window condition on Subway Platform, typical paint condition Concrete Rough Opening with some blocking for windows installed at header
Poor Window condition on Subway Platform, typical paint condition
Concrete Rough Opening with some blocking for windows installed at header
Shop mockup of subway window panels, in repair, before sanding or painting Repaired sashes glazed being painted, special ribbed glazing
Shop mockup of subway window panels, in repair, before sanding or painting
Repaired sashes glazed being painted, special ribbed glazing
Restored and painted sash, with S.S. mesh panes Window and panel blocking during installation
Restored and painted sash, with S.S. mesh panes
Window and panel blocking during installation
Window framing installation detail Window framing and paneling installation complete
Window framing installation detail
Window framing and paneling installation complete
Installed windows, prior to cleaning and on-site painting of last coat Windows of one of 58 bays  installed, viewed from street level

Installed windows, prior to cleaning and on-site painting of last coat

Windows of one of 58 bays?installed, viewed from street level