P.S.1, NYC School Construction Authority. Yetman Street, Staten Island, NY.

Project manager: York Hunter, Mr. Alton Lewis
Owner: NYC School Construction Authority
Completion Date: July & August, 1999

 

Scope of Work:
Fabricated, finished and installed built-in Eastern white pine gutter and 5'H cornice system for this 1878 brick building. Fabricated (170) five element modillion brackets, some with pierced fretwork ornamentation 3'H, along 300' length. Restored deteriorated gable ends. Work performed July 20 through August 31, 1999.

Building listed in National Register of Historic Places.

Architect: STV / Silver & Ziskind, Mr. Lenny Sherman, AIA

VICTORIAN BUILDING WOODWORK RESTORATION DURING

VICTORIAN BUILDING WOODWORK RESTORATION DURING

 

Solid pine, up to 16" wide, was utilized at Olek's increased cost even though marine plywood was specified, for the superior longevity of the gutter installation.
 
  VICTORIAN WOODWORK RESTORATION VICTORIAN WOODWORK PRESERVATION
     
  VICTORIAN WOODWORK RESTORATION DURING VICTORIAN WOODWORK RESTORATION AFTER CORNICE & GUTTER
    200 modillion brackets and 33 pierced fretwork brackets were recreated in pine.
  VICTORIAN WOODWORK RESTORATION AFTER NYC SCHOOL BUILDING WOODWORK RESTORATION
    In only 5 weeks the work was completed, despite custom molding changes necessitated by masonry errors in the roof sill. Project initially was to allow 4 months for wood gutter/cornice system.